    Hi sougata,

    I m using power failure indication for UPS,wen it detects,i should start the inverter,also wen power resumption occur i should turn off the inverter and start with main.

    How can acheive this task,plz give ur ideas to implement,I m using PIC16f72.

    I am waiting for ur reply.

  2. #2
    Join Date
    Feb 2005
    Location
    Kolkata-India
    Posts
    563


    Did you find this post helpful? Yes | No

    Default Try solving one after another

    Hi,

    It has happened in the past that I have committed to help on some specific issues offline of the forum but could not actually keep up to my commitments. So rather than showing you specific pointers it would be better if you cross each hurdle - one at a time. This would ensure that other forum members take interest try to solve your problems. Cause being a one man army I hardly get time to log onto the forum [I visit mostly when I am in trouble - I know sounds selfish ]

    For your project :

    While in mains -->
    Monitor Zero Cross for abnormal timings
    Monitor Mains Voltage (through Sense Transformer)

    To achieve fastest transfer start sampling the mains voltage from the zero cross and validate against a lookup table to be within range every 0.5ms. Your ADC pin should see the mains voltage as a 100Hz fully rectified DC waveform. In a blind sampling can detect zero-crosses within 0.5mS accuracy. With a clock of 20MHz shouldn't be much trouble. Even works at 4MHz Internal Osc. I have done a square wave UPS with a 16F676 internal Osc (In full assembly However)

    While in inverter mode --->

    A periodic sampling (every 1 sec) of the input AC voltage may be enough alone. However if you require valid Frequency range then Zero-Cross might be needed. When found normal you can activate the restore to mains routine. Here you need to take care of output voltage regulation through PWM (software if square wave) and also protect MOSFETs from over-current, besides doing housekeeping such as battery-low, no-load shutdown, PC connectivity (16F73 recommended or any other with Hardware USART)

    Breakup your job in discrete sections. Then assemble the whole when each one is ready.
    Good Luck

    P.S. - It is not that I do not want to share my code. But sometimes legally tied.
    Last edited by sougata; - 27th August 2008 at 10:15.
    Regards

    Sougata

  3. #3
    Join Date
    Aug 2008
    Posts
    22


    Did you find this post helpful? Yes | No

    Default

    Thanks for the reply.

    I will explain u wat i did(using assembly).
    inputs to controller:
    1.Actually main is an analog i/p to M/C.
    2.power failure indication(digital).
    3.volt zero cross and current zero cross are two digital i/p.
    4.Overload and battery i/p are two analog.
    -----------------------------------------------------
    1.first step,i intialised all requirements.then using PA0,i read the mains voltage range.and compared with reference for stabilizer operations.zero crossings are used for stabilizer operation.
    2.if the voltage is outof reference range,i will start the inverter.here i m readin overload and battery i/p.

    plz tell me how can i know whether i/p main is present or not(can use interrupt).which pin need to connect.
    plz correct me,if wrong.If u want i'll give u my code.
    Last edited by kvrajasekar; - 27th August 2008 at 11:36.

  4. #4
    Join Date
    Feb 2005
    Location
    Kolkata-India
    Posts
    563


    Did you find this post helpful? Yes | No

    Default Use zero cross on portb.0

    Hi,

    16F72 has portb.0 interrupt which can be used to detect zero crossing easily. Since the current zero cross would be normally close to the voltage zero cross. It may be detected right within the ISR. However entirely depends on the capacity of the UPS and power factor. You can also use the PORTB.7-PORTB.4 Interuupt on change. Here however you need to decide in the ISR whether it is volt/current zero cross or overload. You can use four different signals here.

    I assume that you are in India from your name. So the nominal line frequency would be 50Hz. That means you should get interrupts after every 10mS. Add to that a range of +/- 5 Hz so your window becomes 45Hz to 55Hz wide. Thus you know when your interrupts are too-late or too-early. This is a definite detection of blackout/brownout. But power sags are cannot be detected by this methods.

    So you can start a AD sampling cycle from each zero cross and continue sampling the input (unfiltered). At the end of the cycle you can detect even the RMS voltage through calculations. But this takes a whole cycle (10mS) which may be too much. So the alternative is to compare each sample with known values. Use a lookup table +/- constants for allowed deviation range. This has its own pros and cons. Almost fail proof mains detection but sometimes false detects too.

    However it entirely depends on the equipment in use. All of the offline UPS in the marker under Rs.1500.00 (USD $36 approx) state that they offer a transfer less than 2ms. Not always. In fact the relays which comes for Rs. 6.00 (USD $0.15) exhibits transfer time more than 7mS themselves. Datasheets lie for chinese products. If the supply is to a PC then the PC SMPS itself withstands 20mS sags. That's why the low cost UPS actually seem to work.

    When I started working on the project (I normally try to get industrial applications) I was frustrated achieving goals. Realized the limitations later that a reduced BOM price achieves less.
    Regards

    Sougata

Members who have read this thread : 0

You do not have permission to view the list of names.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts