Sorry I had a little time to check all suggestions, but if there's a timing issue, I have series of 16 APA102C leds connected to the same 1936, they are driven via SHIFTOUT and everything works properly. So if MIBAM is messing with SERIN2, it should mess with SHIFTOUT as well?