touble with a time calculation


Closed Thread
Results 1 to 40 of 59

Hybrid View

  1. #1
    Join Date
    Jun 2009
    Location
    Sc*nthorpe, UK
    Posts
    333


    Did you find this post helpful? Yes | No

    Default Re: touble with a time calculation

    A clock does not have values of

    24 hours
    60 min
    60 sec
    100 100th

    for example a clock showing 59 seconds will change to 0 on the next second.

    the calculation

    if Seconds - Set_Sec <0 then
    OT_Minutes = OT_Minutes - 1
    OT_Seconds = 60 - Set_Sec + Seconds
    endif

    should be

    if Seconds - Set_Sec <0 then
    OT_Minutes = OT_Minutes - 1
    OT_Seconds = 59 - Set_Sec + Seconds
    endif

    and the same for the other < comparisons.

  2. #2
    Join Date
    Feb 2012
    Location
    PERTH AUSTRALIA
    Posts
    838


    Did you find this post helpful? Yes | No

    Default Re: touble with a time calculation

    yes it should as its look for 0 only value , also removing the "and" will reduced compile size as well a little , good idea

Similar Threads

  1. Help with calculation
    By Megahertz in forum mel PIC BASIC Pro
    Replies: 3
    Last Post: - 28th August 2012, 17:10
  2. CHECKSUM CALCULATION, Please Help!
    By wasilus in forum mel PIC BASIC Pro
    Replies: 5
    Last Post: - 2nd August 2012, 07:55
  3. Calculation Problem - value goes to zero after 65
    By Tom Gonser in forum mel PIC BASIC Pro
    Replies: 14
    Last Post: - 12th March 2010, 05:10
  4. calculation
    By lerameur in forum mel PIC BASIC Pro
    Replies: 3
    Last Post: - 20th May 2008, 16:28
  5. CRC Calculation - Need a little help
    By Steve43 in forum mel PIC BASIC Pro
    Replies: 8
    Last Post: - 13th March 2005, 01:23

Members who have read this thread : 0

You do not have permission to view the list of names.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts