
Originally Posted by
psdayama
Dear Saugata,
please read my comments pointwise:
When one is making Inverter/UPS then the transformer and MOSFETS
have to handle this currents and I have seen atleast 3in parallel to do this.
I think It is OK for 500VA and for 1KVA one has to use 24V battery for same
purpose. Higher rated systems are using batteries 48V or even 110V!!!
Frequency has been optimised to 40-60KHz for considering this aspect.
I would like to use more than 100Khz if possible but then MOSFETs would be
beyond reach.
My design has 3 switching stages. a)First for conversion to 12V from 230V(SMPS), second a simple Inverter to convert 12Vdc to 300V dc dual supply and lastly the Sinewave converter with half bridge for direct output.
SMPS is based on SG3525 and dc to dc also same but they can have analog
control inputs with additional PWM from Microchip instead of DAC.The last converter is entirely based on Microchip and same chip can used for other indication or control functions. One has to consider the entire system development and how to make optimum use of available resources. It is just
not possible to use one PIC for all functions reqd.
Please do send link for that design.
Im not aware of PBP. I am doing programming in Assembly and use a
program to convert it in code.
Im very interested know about it.
Please visit cosmo ferrite website. They have dealers all over India and
Kolkata must be having some. If U want some hard to get size then I can
help. But for regular supplies the company will gleadly contact U.
I think I have missed Ur reply due to incorrect setting of intimation. Im
sending U private email for details.
Thanks,
psdayama
Bookmarks