Hi,
It seems to me like that SPDT (with center position off) switch controlls two relays/contactors (CR1 and CR2). The contacts of these relays/contactors forms a H-bridge.
/Henrik.
Hi,
It seems to me like that SPDT (with center position off) switch controlls two relays/contactors (CR1 and CR2). The contacts of these relays/contactors forms a H-bridge.
/Henrik.
Bookmarks