Hey Dennis!
I'm still lurking about, but it seemed like you have things under control and I don't have a whole lot more trouble to stir up....
Besides, I've been seriously swamped with work obligations, family obligations, personal projects I'd like to complete soon, and now we've had a LOT of rain here in the last couple of weeks and I've been spending some time keeping our steep hillside property under control. Been spending a lot of my free time with a shovel, cleaning ditches and culverts and keeping 800 feet of gravel driveway (with 140 feet of elevation gain and 2 switchbacks) from blowing out....
I figured to just take care of chores, quietly watch the forum, and wait for your final schematic and report.
Do you really need some measurements from me? If you've got something specific in mind I'll see what I can do. But you seem capable enough and pretty well in tune with the safety issues...
steve
Bookmarks